Hi Owais, my public liability insurance will cover me for 1 million, the rams can be produced if you send me some photos of the work area and appliances. no hot works are needed for the task. and all mains water will be isolated during the works. I can do this in the evening of the 2nd and be finished by the the morning of the 3rd. I would need to measure for the push fit pipes and connections and would ask if you are willing to upfront these materials
Hi Owais, I can provide a RAMS and insurance for the day, are you requiring new pipe work for this project, before I produced a RAMS, I would need to know if I can use push fit plastic or copper
Hi Owais, my public liability insurance will cover me for 1 million, the rams can be produced if you send me some photos of the work area and appliances. no hot works are needed for the task. and all mains water will be isolated during the works. I can do this in the evening of the 2nd and be finished by the the morning of the 3rd. I would need to measure for the push fit pipes and connections and would ask if you are willing to upfront these materials